INSTALLATION-6

  1. A column has to be raised on the side of the tank.
  2. Pump is mounted on the column as shown in sketch.
  3. In the suction line a foot valve has to be fitted.
  4. Prime the pump through delivery pipe,so that liquid comes to the overflow line.
  5. Start the pump and open delivery valve .
Other installations
1 2 3 4 5